Paint line output: UPH and required cycle time

Compare the production target with the line interval and estimate the cycle needed for the required number of accepted units.

Open calculator

Calculation logic

Accepted output = planned time × A × P × Q / cycle; required cycle = planned time × A × P × Q / target output.

Worked example

An 8-hour shift with 40 minutes of planned stops leaves 26,400 seconds. At a 90-second cycle, ideal output is about 293 units before losses and quality yield.

Before using the result

Subtract planned stops from time first. A, P and Q represent unplanned downtime, reduced pace and quality; do not count the same loss twice.